Construct

Modeling bridge construction phasing by the balanced cantilever method ¿ ¿Comparison between predicted and real camber values¿

Modeling bridge construction phasing by the balanced cantilever method ¿ ¿Comparison between predicted and real camber values¿

  • Year: 2015
  • Type: Paper in International Conference Proceedings
  • Authors: Castro (Outra); LG ( Outra); Bastos ( FEUP); R (); Rui Carneiro de Barros ()
  • Content: Ata de Conferência : International Conference on Multi-Span Large Bridges p. 1181-1188
  • DOI: http://doi.org/10.1201/b18567-154
  • Index: Scopus