Construct

Installation and results from 18 months of operation of the dynamic monitoring system of Baixo Sabor arch dam

Installation and results from 18 months of operation of the dynamic monitoring system of Baixo Sabor arch dam

  • Year: 2018
  • Type: Paper in International Conference Proceedings
  • Authors: Álvaro Cunha (FEUP); S. Pereira ( Outra); Filipe Magalhães ( FEUP); J. Gomes ( Outra); J. V. Lemos ( Outra)
  • Content: Ata de Conferência : 6th International Symposium on Life-Cycle Civil Engineering (IALCCE 2018) p. 1167-1167
  • Index: ISI Web of Science, Scopus